Click logo to go to County homepagePlanning and Development Energy Division  
 [  You Are Here:  County Home : Planning & Development Home : Energy Home : ERG West Cat Canyon Revitalization Plan  ]
Site Search
Contact Us
 Energy Division Home
 Announcements
 Who We Are
 Oil & Gas Facilities Maps

Projects
Aera East Cat Canyon
Oil Field Redevelopment

Cuyama Solar Array
E&B Resources
ERG West Cat Canyon
Revitalization Plan

ExxonMobil
Foxen Petroleum Pipeline
Gaviota Terminal
Abandonment

Granite Construction
<empty> Hercules
Lompoc Stone
North Garey Oil and Gas
<empty>Production Plan

<empty> Pacific Coast Energy Co.
<empty> PetroRock UCCB
<empty> Phillips66
Plains Pipeline, L.P.
FMO&G Pt. Arguello
FMO&G Tranquillion
<empty>Ridge & Pt. Pedernales

<empty> Santa Maria Energy Oil
Production Plan

<empty> SEPV Cuyama Solar
<empty> Shell Guadalupe Gravel
<empty> Southern CA Gas Storage
Enhancement

<empty> Strauss Wind Energy
<empty>
Venoco Line 96

Archived Project Pages

 Onshore Permitting &
Inspection
 Permit Compliance
 Mitigation Programs
 Links to Other Sites
end-section divider

In case of an oil
spill or gas release:

Call 911

Facility Operators
must also call:

Governor's Office of
Emergency Services
1-800-645-7911


Energy, Minerals &
Compliance Division
(805)568-2519


Click here for other
reporting requirements



Click here for normal
business hours contacts
 
 

ERG West Cat Canyon Revitalization Plan

[Information up to date as of 02/11/2019]


What’s New

The proposed Final EIR for the ERG project was released on February 11, 2019 and is available below, under Documents. The proposed Final EIR includes responses to comments received on the Draft EIR (see Final EIR Section 10.0) and revisions to the EIR text as appropriate. The Planning Commission will consider the project at its regular hearing in Santa Maria on March 13, 2019. The staff report for this hearing will be available in late February and will be posted here and at http://sbcountyplanning.org/boards/pc/cpc.cfm prior to the hearing.


Project Description

The WCCPP project includes the development of 233 new thermally enhanced (steam injection) wells, installation of four additional steam generators, and replacement of the existing 4-inch diameter fuel gas pipeline with an 8-inch diameter line. The project includes 10 new well pads, 1 new steam generator pad, and the use of 91 existing pads for a total of 102 well and equipment pads, the installation of inner-field piping and other supporting equipment. All proposed facilities would be located on approximately 75 acres within ERG’s 8,054-acre West Cat Canyon property holdings. Existing ERG operations include 185 active or idle non-thermal wells and 314 active or idle thermal wells. Water for steaming the proposed wells would be obtained from the brine water produced by ERG’s field operations on the Project property.

Project Area Map

ERG West Cat Canyon Project Area


Documents

Final Environmental Impact Report, February 2019

Draft Environmental Impact Report, June 2018

Notice of Draft EIR Public Comment Workshops

Notice of Availability, June 4, 2018

Notice of Completion, May 24, 2018

Final Scoping Report, October 2015

Notice of Preparation, August 24, 2015

Permit Application Materials


Past Activities

  • August 3, 2018: Public comment period on the Draft EIR closed.

  • July 17, 2018: Public comment hearing on the Draft EIR held in the Planning Commission Hearing Room in Santa Barbara (audio recording of speaker comments is available here; video recording not available).

  • June 25, 2018: Public comment hearing on the Draft EIR held on at the Betteravia Government Center in Santa Maria (video available at: https://youtu.be/vYSwu9btKoI?t=508).

  • June 4, 2018: Draft EIR released for public review.

  • September 16, 2015: Public Scoping Meeting held in Santa Maria.

  • August 17, 2015: Notice of Preparation was released of an Environmental Impact Report (County Case Number 15EIR-00000-00004).

  • March 3, 2015: The Board of Supervisors approved a contract for Aspen Environmental Group to prepare an Environmental Impact Report for the project.

  • October 2, 2014: The application was determined to be complete.

  • September 14, 2014: ERG re-submitted an application for an Oil Drilling and Production Plan and a Development Plan.

  • July 3, 2014: The application was determined to be incomplete.

  • June 3, 2014: ERG submitted an application for an Oil Drilling and Production Plan and a Development Plan.

  •  
    end of page content

    Top