The requirements for each property will be different, but they may include:

  1. Current topographic survey of project site

  2. Property line survey

  3. Hydrologic analyses of the project site to reflect post-burn (Thomas) conditions. Analysis should utilize and build upon the information in two technical reports: the Burned Area Emergency Response (BAER) Team report and the Watershed Emergency Response Team (WERT) report, which also includes the work of the SoCal Watershed Task Force.

    1. Calculation of the current base flood elevations, inundation limits and possibly the floodway

    2. Key design elements include channel geomorphology, foundation considerations, and hydraulic capacity.

  4. Preparation of plans may require utilization of professionals with expertise in geotechnical, civil and hydraulic engineering, soil erosion, hydrology, and engineering geology